翻訳と辞書 |
Ayalon Highway : ウィキペディア英語版 | Highway 20 (Israel)
Highway 20, more commonly the Ayalon Highway〔(Ayalon Highways ), official website \ English〕 ((ヘブライ語:נתיבי איילון), pronounced: ''"Netivei Ayalon"'', lit. "Ayalon Routes"), is a major intracity freeway in Gush Dan, Israel. The road runs along the eastern border of central Tel Aviv from north to south (with a planned east-west branch as well) and connects all of the major highways leading to the city—such as Highway 4 from Ashdod and the Southern regions, Highway 2 from Haifa and the Northern regions, Highway 5 from the East, and Highway 1 from Jerusalem and the Southeast. The Ayalon Highway is heavily travelled and on an average day almost 600,000 vehicles enter the freeway. It consists of a multi-lane highway with a multi-track railway located between the opposite travel lanes. Some of the highway's route is along the Ayalon River, hence its name. == Background == Before the construction of the Ayalon Highway, all the major inter-city highways leading to Tel Aviv terminated in the outskirts of the city. This created major traffic congestion in the entry and exit points and made driving through the city very difficult. Moreover, before the highway, Tel Aviv had two separate railway stations, one in the north and one in the south, which were not connected. Thus passengers wanting to travel to the South of the country could only do so from the southern station and those who wanted to travel to the North could only do so from the northern (Central) station. Even worse, trains from the northern part of the country could not travel to the southern part of the country without bypassing Tel Aviv from the east, making train travel in Israel very inefficient. Finally there was the problem of the Ayalon River, which went through parts of Tel Aviv and would sometimes cause flooding. To solve these problems, as early as the 1950s ideas were raised regarding using the route of the river as a transportation corridor, but it wasn't until the mid-1960s that the government began planning. In the 1970s a government-owned company, ''Ayalon Highways Ltd.'', was set up to construct the highway. The first phase included construction of a concrete channel for the Ayalon River to alleviate the flooding problem. In 1982, the first section of the road opened, and in 1991 the final section of the central part of the road was completed. This section connects Route 1 in the south with Route 5 and Route 2 in the north. A railway with four stations was built in the center of the highway, which provided for the long-sought connection of Israel's railway network through Tel Aviv. In the early 1990s the construction of a southern section of the highway had started. This section goes from the HaHagana railway station through the southern Tel Aviv suburbs of Holon, Bat Yam and Rishon LeZion and connects to Highway 4 north of Yavne. After the highway splits with the Ayalon River at Highway 1, it goes on the route of a road called Heyl HaShiryon Road (דרך חיל השריון, "The Armored Corps Road"), then on the route of Yigael Yadin Road until Wolfson Interchange, where it goes on the route of Yigal Allon Road (דרך יגאל אלון).
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Highway 20 (Israel)」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|